What EASYPASS is
EASYPASS is the pre-shipment verification of conformity programme run by the Ghana Standards Authority (GSA) for exports bound for Ghana. Under the GSA data sheet (revision 1.0, May 2026), the Notice to Importers went out on 18 May 2026, operations began on 1 June 2026, and certification became compulsory from 1 July 2026 based on shipment date. Any covered consignment shipped on or after 1 July 2026 requires clearance under the programme, whereas cargo shipped before that cut-off is exempt.
Shipments that pass receive a Certificate of Conformity (CoC); those that fail receive a Non-Conformity Report (NCR). GSA's evaluation combines a paperwork review, laboratory control testing where required, physical inspection, and the route-based facilitation arrangements outlined below.
What is covered
The GSA sets scope by tariff heading under the Ghana CET (HS 2017). According to the data sheet, covered codes start with chapters 25, 27, 28, 29, 31, 32, 3403, 36, 37, 38, 39, 40, 42, 47 to 65, 68 to 76, 78 to 80, 82 to 87, 89, 90, 94, 95 and 96. In day-to-day sourcing from China, that captures plastics and rubber, textiles, base metals and metal hardware, machinery and electrical equipment (chapters 84 and 85), vehicles and spare parts, furniture, and a wide range of general merchandise.
Two categories sit outside mandatory scope. Prohibited second-hand goods are excluded, as are products overseen by the Ghana Food and Drugs Authority—including food, cosmetics, and pharmaceuticals—though the data sheet notes that exporters can still apply for FDA-regulated lines voluntarily. Always check the exact HS code of every invoice line against the GSA list before committing to an order.
Who applies and what they submit
The exporter files the application—known as a Request for Certificate (RFC)—through the GSA programme portal at easypass.gsa.gov.gh. The data sheet calls for three sets of paperwork: a final commercial invoice (a proforma invoice is enough to open the file), technical conformity papers such as test reports, quality certificates, or analysis reports, and the factory's quality management system certificate if it holds one.
Because the filing sits with the Chinese side, importers who leave it to the supplier until the goods are packed often face delays. Before placing the deposit, ask the factory which test reports it already has on hand, which lab issued them, and whether its quality management certification is current.
Standards, testing and inspection
Products are assessed against technical standards in a fixed hierarchy: Ghanaian standards take precedence, followed by international standards, then European and national standards, with the manufacturer's own specifications accepted only when no official standard exists. All standard-mandated product markings and user instructions must appear in at least English.
If test reports are missing or fall short of requirements, the shipment goes to control testing. The data sheet calls for an ISO 17025 accredited laboratory, while setting out specific conditions under which a factory's in-house lab or another third-party facility can be used. Physical inspection verifies product identity and labelling on site. Container loading supervision and sealing are carried out where required, and the data sheet explicitly rules out destination inspection upon arrival in Ghana. Once the physical check is done, the inspector issues an Inspection Report.
Fees
The exporter pays all programme fees and bank charges. Fees exclude applicable taxes and cannot be refunded once assessment begins. The ad valorem rate scales according to the assessment route:
| Route | Ad valorem fee (% of FOB) | Minimum fee | Additional facilitation fee |
|---|---|---|---|
| A | 0.550% | USD 350 | None listed |
| B | 0.500% | USD 300 | Registration: USD 400 a year for the first 15 product lines, then USD 25 per extra line a year |
| C | 0.400% | USD 275 | Annual factory assessment: USD 1,200 per factory a year |
Because the May 2026 data sheet does not spell out the eligibility rules for each route, exporters should check directly with the GSA or their appointed assessor to confirm where a product fits. Looking at the numbers, the pricing clearly favours repeat shippers: spot orders will generally go through Route A, whereas a supplier loading the same SKUs month after month can lower its per-shipment rate through product registration or an annual factory audit.
Planning a shipment around it
- Verify HS codes against the GSA scope list when requesting quotes rather than waiting until space is booked.
- Write EASYPASS responsibilities into the purchase contract, spelling out who lodges the RFC, who absorbs the fee, and who bears the cost if an NCR is issued.
- Gather existing lab reports before production finishes. When papers are missing or rejected, control testing will hold up the CoC.
- Check artwork and carton markings early to make sure English labels meet the applicable standard.
- Match the commercial invoice, packing list, and bill of lading line for line with the final CoC to avoid holds at the Ghanaian port.
What this means for buyers in Ghana
Because compliance checks now happen before loading in China and are billed to the exporter, suppliers will build the fee into their unit prices or list it as a surcharge. When comparing factory quotes, check whether the EASYPASS fee is already included and which route the supplier used to calculate it. Before the vessel sails, check with your clearing agent in Ghana on how the CoC must be lodged in the customs system, as port filing rules often evolve faster than published programme guides.
How GoFair handles it
Before we send out a quote, we screen every item's HS code against the EASYPASS scope list, pull existing test reports from the factory, and help the supplier assemble the RFC file. When a physical inspection is required, we schedule it alongside our own pre-shipment quality check so the factory only hosts one visit. Prior to booking vessel space, we cross-check the draft certificate against the commercial invoice and packing list.
Related guides: Importing from China to Kenya: PVoC, CoC and Customs and Customs Clearance in Nigeria.
Official references and scope
Consult the official GSA links below for the latest rules. Because covered HS codes, fee schedules, and port procedures are subject to revision, double-check current requirements before paying a deposit or booking freight.